Fixed scope project
A defined outcome with a defined end. Suits an audit, a single migration or a recovery rebuild where the boundary is clear.
- Priced against the stage plan
- Milestone based
- Handover with runbooks
How We Work
Four stages, each signed off before the next begins, and each producing something the business can act on by itself. Funding that arrives in tranches should never strand the work halfway.
Operating rules
Nothing is drawn until we know what is actually running, including the undocumented parts. A design built on an inaccurate picture is a plan to find problems during cutover.
Every cutover has a tested path backwards before it is given a date. If the reverse has not been rehearsed, the forward move does not get committed.
A stage that only pays off if the next one is funded is a hostage, not a plan. Every phase leaves the estate defensibly better than it found it.
The engagement
A full inventory of what is running, mapped to what depends on it. End of support exposure is ranked by business impact rather than by asset age, so the list you get back is ordered by what actually falls over first.
Target architecture across cloud, storage, recovery and power, costed and sequenced. Energy is priced into the design rather than assessed separately, because it is now large enough to change which option wins.
Work lands in increments the operation can absorb. Recovery times are proven under load before anything carries production traffic, and every window has a rehearsed way back.
Managed support, scheduled recovery rehearsals and standing executive advisory, so the estate holds its position instead of drifting back toward end of support over the next three budget cycles.
Engagement Models
A defined outcome with a defined end. Suits an audit, a single migration or a recovery rebuild where the boundary is clear.
Ongoing operation of the estate we designed, or of one we inherited and assessed first. Rehearsals are scheduled, not requested.
Standing access to the technical position without a delivery commitment. For executives who need a straight answer before a board meeting.
Boundaries
A cutover without a rehearsed way back is a gamble with someone else's operation. We will move the date rather than take that risk on your behalf.
We hold no resale margin. If the incumbent platform is supported, recoverable and efficient, the recommendation is to keep it.
If an engagement would need a delivery unit we do not have, we say so at qualification rather than discovering it during stage three.
Recovery objectives in our documents are ones that have been executed under load. Anything else is an estimate and gets labelled as one.